Description

This contract was executed on the two banks of the Lima river near the bridge of Nossa Senhora da Guia, at Ponte de Lima. The initial project included the completion of two wells with a diameter of 16m and a depth of 14m and 19m through secant pile walls supported by circular rings of reinforced concrete. The workaround was the implementation of wells through soil treatment using the CSM technology.

Project Owner

Águas do Minho e Lima

Contractor

Consortium DST / Isolux Corsán

Location

Ponte de Lima, Portugal

Special Works

  • 3550 m³ Cutter Soil Mixing
  • 2200 ml steel sections IPE 300 and IPE 500